Willoughby, Ohio
Completed: 2011
* Cost: $4 Mllion
** Area: 19,500 Sq. Ft.

* Construction Cost
** Gross Square Footage

The Veale Wellness Center is a 15,970 square foot aquatic and fitness center addition to the existing Breckenridge campus. The building construction consists of a concrete block and heavy timber structure to enclose the new indoor heated swimming pool, locker rooms, club lounge, spaces for therapeutic services, fitness area with exercise equipment, and a perimeter walking track. The building connects to the adjacent parking garage and multi-story residential building.